Biofuels Digest · News
Ireland's Mitchelstown Biomethane Injection Facility Targets 12% of 2030 Goal
Published:
English editorial record · proofuel
Key points
- Gas Networks Ireland's Mitchelstown facility can inject up to 700 GWh of biomethane annually, meeting 12% of Ireland's 2030 target of 5.7 TWh.
- The first-of-its-kind European facility prepares biomethane from waste for injection into the national gas network, potentially saving 130,000 tonnes of CO₂ emissions per year.
Summary
Gas Networks Ireland's Mitchelstown facility can inject up to 700 GWh of biomethane annually, meeting 12% of Ireland's 2030 target of 5.7 TWh. The first-of-its-kind European facility prepares biomethane from waste for injection into the national gas network, potentially saving 130,000 tonnes of CO₂ emissions per year.
Original source title
Ireland’s central grid injection facility can meet 12% of 2030 target
This page provides an editorial summary and links to the original source.
Read the original